The Complete Guide to Starting Your Garage Management Software Trial

Software Tips — SeSar blog

Considering garage management software but not sure where to start? This guide walks you through everything.

Before You Start Your Trial

What to Prepare

  1. Your workshop layout – How many bays/ramps do you have?
  2. Customer data – Names, phone numbers, VRMs (if available)
  3. Typical job types – MOTs, servicing, repairs, tyres, etc.
  4. Team members – Who needs access to the system?

Time needed: 30-60 minutes to gather information

Questions to Ask Software Providers

Before committing to any trial:

  • Is there a credit system for SMS or VRM lookups? (Hidden costs add up)
  • What’s included in the monthly price? (Avoid surprise charges)
  • Is training and support included?
  • Can you cancel anytime or are there contracts?
  • Is the system UK-specific? (DVLA integration, SMS formatting)

Day 1: Setup and Configuration

Initial Setup (30 minutes)

  1. Create your account and log in
  2. Add your garage details (name, address, phone)
  3. Configure your workshop bays/ramps
  4. Set your opening hours

Tip: Use simple bay names like “Bay 1”, “Bay 2” or “Ramp A”, “Ramp B”

Adding Your Team (15 minutes)

  1. Invite team members via email
  2. Assign appropriate access levels:

Full access: Managers, owners – Booking access: Front desk staff – View only: Mechanics (if needed)

Day 2-3: Import Customer Data

Option 1: Manual Entry (Best for <50 customers)

Add customers one by one with:

  • Name
  • Phone number (for SMS)
  • Vehicle registration (VRM)
  • Email (optional)

Option 2: Bulk Import (Best for 50+ customers)

  1. Export existing customer data to spreadsheet
  2. Format columns: Name, Phone, VRM, Email
  3. Upload to the system

Time needed: 1-3 hours depending on customer count

Day 4-5: Test Core Features

1. Book Test Appointments

  • Create 3-5 sample bookings
  • Practice drag-and-drop scheduling
  • Try moving bookings between bays
  • Test editing and cancelling

2. Try SMS Communication

  • Send a test booking confirmation
  • Try a “vehicle ready” message
  • Send a test MOT reminder

Note: Most systems let you send SMS to yourself for testing

3. Use VRM Lookup

  • Look up a few customer vehicles
  • Check MOT history is displayed
  • Verify MOT expiry dates are captured

4. Generate Test Invoices

  • Create a sample job with services and parts
  • Generate an invoice
  • Test different payment methods

Week 2: Real Customer Usage

Gradual Rollout Strategy

Day 8-9: Use system for NEW bookings only (keep existing diary) Day 10-12: Migrate this week’s bookings to the system Day 13-14: Go fully digital, retire paper/old system

Why gradual? Reduces risk and gives your team time to adapt.

Training Your Team

  • Front desk: Focus on bookings and customer communication
  • Workshop: Teach job status updates and time tracking
  • Managers: Cover reporting and analytics

Training time: 1-2 hours per person

Measuring Trial Success

Key Metrics to Track

Time saved: How much faster is booking compared to old method? ✅ Double bookings: Have they been eliminated? ✅ Customer communication: Are SMS updates improving customer satisfaction? ✅ Team adoption: Is everyone using the system consistently?

Red Flags to Watch For

🚩 System is slower than old method (may need training) 🚩 Team resisting change (communication issue) 🚩 Missing features you need (wrong software choice) 🚩 Hidden costs appearing (check pricing transparency)

Common Trial Mistakes to Avoid

Not testing SMS – This is usually the biggest time-saver ❌ Skipping DVLA integration – Automatic MOT tracking is crucial ❌ Keeping the old system running – Dual systems confuse everyone ❌ Insufficient training – Team needs to understand benefits ❌ Giving up too early – Allow 2 weeks for adaptation

Making Your Final Decision

After 14 days, ask yourself:

Is the software saving you time?

  • Bookings faster? ✓
  • Fewer double bookings? ✓
  • Less admin work? ✓
  • Better customer communication? ✓

Is the cost justified?

  • Calculate time saved (hours × wage)
  • Add revenue from better scheduling
  • Factor in customer retention improvements
  • Compare to monthly software cost

Example calculation:

  • Time saved: 8 hours/week × £12/hour = £96/week = £384/month
  • Software cost: £89.99/month
  • Net benefit: £294/month (plus intangible benefits)

Is the system easy to use?

  • Team adopted without major issues? ✓
  • Intuitive interface? ✓
  • Reliable performance? ✓
  • Good support when needed? ✓

After Your Trial: Next Steps

If You’re Continuing

  1. Migrate remaining historical data (if needed)
  2. Set up automated MOT reminders for all customers
  3. Create custom SMS templates for your brand
  4. Explore advanced features (reporting, analytics)
  5. Optimise bay schedules based on usage data

If You’re Not Continuing

  • Export your data before trial ends
  • Provide feedback to the vendor (helps improve products)
  • Consider what would make the software work for you
  • Keep contact details for future evaluation

Why SeSar Stands Out

When evaluating a garage management system, SeSar offers distinct advantages:

  • Unlimited SMS – No credits or hidden costs
  • Unlimited VRM lookups – DVLA integration included
  • No contracts – Cancel anytime, no penalties
  • UK-focused – Built specifically for British garages

Trial Success Story

“We were skeptical about software, but the trial changed everything. Within a week we eliminated double bookings, within two weeks our customers were raving about the SMS updates. We’ve saved 12+ hours per week on admin.” – Mike, Midlands MOT & Service Centre

The bottom line: A well-executed trial gives you clear evidence whether garage management software will transform your workshop. Take it seriously, test thoroughly, and make a data-driven decision.